Delete a shipment from a plan – Load Build Control (Employee)
Click Load Build > Work with Plan > Control. The Load Build Control screen is displayed.
Click Remove from Plan under Shipment Leg Operations. The Remove Shipments from Plan screen is displayed.
Enter the required information.
Click Submit. A message indicates the number of shipment legs that were successfully removed from the current plan, and the number of shipment legs that satisfied selection criteria but for which the remove operation could not be successfully performed.