Click Load Build > Loads Not Attached. The List of Loads not Attached to Plan is displayed.
Select a load.
Click Attach to Plan. The Attach Loads to Plan screen is displayed.
Specify the target plan for this operation (that is, the plan to which loads are attached).
Click Submit. If one load was selected, a message indicates if the operation was successful. If multiple loads were selected, a message summarizes the results of the operations. The browser returns to the List of Loads not Attached to Plan.